{"id":74090,"date":"2023-06-01T10:38:21","date_gmt":"2023-06-01T10:38:21","guid":{"rendered":"https:\/\/thelatinpostny.com\/?p=74090"},"modified":"2023-06-01T10:38:21","modified_gmt":"2023-06-01T10:38:21","slug":"eted-pone-en-servicio-2-centrales-de-energia-solar-en-bani-y-navarrete","status":"publish","type":"post","link":"https:\/\/thelatinpostny.com\/?p=74090","title":{"rendered":"ETED pone en servicio 2 centrales de energ\u00eda solar en Ban\u00ed y Navarrete"},"content":{"rendered":"<p>La Empresa de Transmisi\u00f3n El\u00e9ctrica Dominicana (ETED) conect\u00f3 y dej\u00f3 en servicio las subestaciones y l\u00edneas 138 kV, Calabaza I en Peravia y Navarrete \u2013 Cruce de Esperanza, interconectando as\u00ed, las centrales de energ\u00eda fotovoltaica Calabaza I y Esperanza, respectivamente.<\/p>\n<p>Mart\u00edn Robles Morillo, administrador general de la ETED, inform\u00f3 que la interconexi\u00f3n y energizaci\u00f3n de la subestaci\u00f3n 138 kV permitir\u00e1 que la planta fotovoltaica Calabaza I, inyecte unos 58.162 MWp (megavatios pico) al Sistema El\u00e9ctrico Nacional Interconectado (SENI).<\/p>\n<p>El proyecto Calabaza I est\u00e1 ubicada en la provincia Peravia, donde la radiaci\u00f3n solar en la zona es de 1.932 kWh\/m2. Cuenta con dos campos de l\u00ednea uno de 138 kV y otro de 34.5 kV. Estos trabajos se realizaron junto a la empresa Enren, S.R.L.<\/p>\n<p>En ese orden, indic\u00f3 que tambi\u00e9n se energiz\u00f3 la l\u00ednea de transmisi\u00f3n 138 kV Navarrete \u2013 Cruce de Esperanza y subestaci\u00f3n 138\/34.5 kV Esperanza, para interconectar la central de generaci\u00f3n fotovoltaica Esperanza, de la Empresa Generadora de Electricidad Haina (EGEHAINA), con una capacidad instalada de 90 megavatios pico (MWp).<\/p>\n<p>\u201cEstamos avanzando hacia una nueva etapa de crecimiento y contribuci\u00f3n al desarrollo nacional, dando respuesta a las necesidades de transmisi\u00f3n de electricidad del pa\u00eds, con un sistema confiable y seguro\u201d, afirm\u00f3 Robles Morillo.<\/p>\n<p>La ETED sigue trabajando arduamente en la ampliaci\u00f3n y adecuaci\u00f3n del Sistema de Transmisi\u00f3n Nacional (STN) para el cumplimiento de los objetivos nacionales en lo referente a la integraci\u00f3n de fuentes de Energ\u00eda Renovable Variables (ERV).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La Empresa de Transmisi\u00f3n El\u00e9ctrica Dominicana (ETED) conect\u00f3 y dej\u00f3 en servicio las subestaciones y l\u00edneas 138 kV, Calabaza I en Peravia y Navarrete \u2013 Cruce de Esperanza, interconectando as\u00ed, las centrales de energ\u00eda fotovoltaica Calabaza I y Esperanza, respectivamente. Mart\u00edn Robles Morillo, administrador general de la ETED, inform\u00f3 que la interconexi\u00f3n y energizaci\u00f3n de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":74095,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[],"class_list":["post-74090","post","type-post","status-publish","format-standard","has-post-thumbnail","category-republica-dominicana"],"_links":{"self":[{"href":"https:\/\/thelatinpostny.com\/index.php?rest_route=\/wp\/v2\/posts\/74090","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thelatinpostny.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thelatinpostny.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thelatinpostny.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/thelatinpostny.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=74090"}],"version-history":[{"count":1,"href":"https:\/\/thelatinpostny.com\/index.php?rest_route=\/wp\/v2\/posts\/74090\/revisions"}],"predecessor-version":[{"id":74099,"href":"https:\/\/thelatinpostny.com\/index.php?rest_route=\/wp\/v2\/posts\/74090\/revisions\/74099"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thelatinpostny.com\/index.php?rest_route=\/wp\/v2\/media\/74095"}],"wp:attachment":[{"href":"https:\/\/thelatinpostny.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=74090"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thelatinpostny.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=74090"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thelatinpostny.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=74090"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}